Peck Ditch Augmentation
Project Information
Peck Ditch Augmentation Structure
City of Longmont Colorado
Vance Brand Airport, Boulder County, 2019
Project Owner
City of Longmont
Project Amount
$286,014.30
Project Date
June 2019 – August 2019
Project References
Larry Wyeno, PE
Engineering Administrator
City of Longmont 350 Kimbark Street Longmont, CO 80501
303.651.8628
larry.wyeno@longmont.colorado.gov
Rhett Hines, PE
Design Engineer
Deere and Ault Consultants, Inc. 600 South Airport Road, Suite 205 Longmont, CO 80503
303.775.1214
rhett.hines@deereault.com
About the Project
The City of Longmont awarded Frontier a contract to construct a 54 cubic yard diversion structure and a 24 cubic yard concrete flume with stilling basin on the Peck Ditch at Vance Brand Airport. The Work included constructing an active diversion of Peck ditch as the project was constructed during irrigation season. The project also included 120 LF of 36” RCP with Flared End sections, grouted riprap, ditch reconstruction, and Airport fencing. The project was constructed in an active ditch which required surface water diversions, dewatering for the duration of the project, temporary ditch crossings and management of stormwater events.